丽春花的英文翻译英语怎么说-人工降雨成本


2023年4月18日发(作者:仁爱英语)Inproved

JournalofHarbinInstituteofTechnology(NewSeries),Vo1.13,No.5,2006
Inprovedgradelengthlimitationoffreeways
XINGEnulong
邢恩辉,裴玉龙
(InstituteofTransportationResearch,HarbinInstituteofTethnology,Harbin150090,China)
Abstract:Amethodofascertaininggradelengthlimitationoffreewaysinmountainterrainispresented.T
here.
1ationshipmodelsbetweenl5percentilespeedsandgradeswerebuiltthroughtheSulweysandanalyseso
foper-
15”percentileand85percentile
as
speedlimitations,themethodsofdeterminingadmittedvelocitieswereputforwardaccordingtothegrad
.
celerationdistancesoin
gtothe
resultsofanalysis,ythevaluesofgradelengthlimitationforfree
ways
wereputfo1~ultscouldbeusedasreferencesforfreewaydesign.
Keywords:roadengineering;gradelengthlimitation;admittedvelocity;vehicledynamics
CLCnumber:U4l2.34Documentcode:AArticleID:1005.9l13(2006)05.0554-05
InChina,thedesignedspeedisadoptedtoproject

signedspeedisthefoundationparametersofroadde
signtoregulatethelowestdesignstandards,andother
ys
manyscholarsofChinaarerealizingtheimportanceof
operatingspeedinthefieldofroadengineering,traffic
engineeringandcost2002,Zhang
Jianfeiputforwardtheuseofoperatingspeedasbasic
parametersinsteadofcalculatedtravelspeedinthede
2003,PeiYulongdis
cussedtheproblemofspeedlimitsforfreewaysutilizing
rongandYang
Shaoweianalyzedthemaximumlongitudinalslopeand
itslengthofmountainfreewayundertheconditionofa
vehicle’nctionof
operationspeedisstillintheinitialstagesoftheoryre,
searchinChinasofar.
Thispaperdiscussesthemethodofgradelength

y.a
typicalvehicle(EQ1108)thatrunsonmountainous
terrainfreewayinChinawasselectedastheresearch
object,andthenananalysiswasperformonthetypical
vehicle(EQ1108)dynamicsutilizingthetheoriesof
ly,theoperationspeeds,15”percen—
tilespeedand85percentilespeedwereinvestigated
andanalyzedin7typicalsectionsof3mountainouster,
raiionshipmodelbetweenthe15”
percentilespeedsandgradientsofroadhasbeenestab,
lishedbymeansofregressionanalysis,thenam喧腾的拼音 ethod
ofdeterminingadmittedvelocityinupslopeshasbeen
epe~rm,
ancesofvehicleand85”percentilespeeddeterminedi,
dealmaximumtravelspeedsoftypicalvehicle
(EQ1l08)er.
thedecelerationdistancesonupslopeswereanalyzed
accordingtotheperformancesofEQ1108vehicle,ad
,
nally,theimprovedvaluesofgradelengthlimitationof
freewaysinmountainterrainhavebeenputforward.
Theresultscouldbeusedasreferencesformo青山有幸埋忠骨整首诗 untain
terrainfreewaydesign.
1VehicleDyanmicsonSlopeWays
1.1EquationsofAutomobileDrive
Thefunctionsofairrisingforceonvehiclesina
perpendiculardirectionshouldn’tbeneglected,forthe
velocitiesofavehiclerunningonfreewaysarehigher,
thereforewededucedoutanautomobileequationcon
sideringthisaffectonvehicledynamicasfollows:
Ft=Ff+FL+F+Fl
or
Mii0/r=Cf+(GFz)i+C,Au/21.15+
6mdu/dt.(1)
whereFtisthedrivingforce,Ft=Me
i{ioqt/r;Ffisthe
rollingresistance,=Cf;Fistherampresistance,
F=(GFz)i;F,istheacceleratingresistance;F:is
theairrising,:CozAVZ/21.15;Fistheairresist
ance,F=CDAu/21.15.
Themeaningsofparameters:Mistherating
torqueofengine:iisthethedriveratiooftransmis
sion;riveratioofmaingears;叼£isthe
efficiencyofdrive;istheradiusofdrivewheels;uis

Reeeived20040106.
SponsoredbytheSpecializedResearchFund
rtheDoctoralProgramotHighEducation(GrantNo.2)

554?

JournalofHarbinInstituteofTechnology(NewSeries),Vo1.13,No.5,2006
thevehiclevelocity:iisthegradient:6isthecircumro
tatequalityconversioncoefficient:misthevehicle
quality:Aistheareasofwindward:Gistheautomobile
gravity;fisthecoefficientofroadresistance;CDzisthe
coefficientofairrising;CDisthecoefficientofairre
sistan将进酒原文及翻译注释 ce:Vistheoperationspeed.
RatingpowerofengineNe
isthevalueinthecondi
tionsatsealevel:Gisautomobilegravityiffullyloaded.
itudeisn’tdatumwa—
loadisn’tfullythatacoefficientA
”ahi—
tudepower—gravity”amendmentcoefficientL4,55.
Eq.(2)canbederivedfromEq.(1)as:
.=+

du
.
Duetoa=(G,l’tl1eJn
AD==

m.
)+
whereisamendmentcoefficientsofaltitude;=
(12.2610H);istheheightof云破月来花弄影下一句 altitude
(m);Nisactualpowersofengine;Gisthegravityof
actualload.
1.2DrivingCircumstanceofVehicleUpslope
Eq.(3)canberewrittenas:
n==
(D_)).
(4)
Eq.(4)isthecalculatedformulaofautomobile
accelerationconsideringtheaffectionofairrising
iscussaccelerationcircumstancesof
vehiclerunningonarampaccordingtoEq.(4).Ac
celerationchangedwhenrampgradientchangedand

whenotherparameterkeepconstant’.
2ChoiceofTypicalVehicle
Trafficcapacitiesof7
wereselected,accordingto
tionofmainstemhighways,
areshowninTab.1.
Tab.1Ratesofvehicletype
highwaysrepresentatively
trafficcapacitiesinvestiga
2000,ults
WecanseetheratesofvehiclesfromTab.2that
smallsizedpassagecarswas34%:thatmiddlesized
truckwas27%:thatlargesizedtruckwas7%.The
affectoframpsonsmal1..sizedpassagecarswassma1..
velocitywashigheranditsdynamicwasbet.
ter;thesurpluspowersoflarge--sizedvehiclewasbig-
gerthanthatofmiddlesizedtruck,andtherateslarge.
s
naturalthatthetypicalmiddlesizedtrucksEQ1108
wereselectedasthevehicletobeanalyzedingr中元节是什么节 ade
lengthlimitationoffreewayinmountainterrainforChi.
sof
erperfomlance
parametersofEQ1108couldbegainedutilizingthe
theoriesofvehicledynamicsaccordingtotheparame
culationresultsofperformance
parametersareshowninTab.3.
ThevelocityprofilesofTruck(EQ1108)forre
fleetingdynamicperformanceinvar世说新语30则名篇原文及翻译 iousgearshiftsare
.1illustratesthevariationintruckper
formancecurvesfordifferentgearshifts.

555?

JournalofHarbinInstituteofTechnology(NewSeries),Vo1.13,V0.5,2006
Tab.2EQ1108techniqueperformanceparameters
Tab.3EQll08calculationperformanceparameters
1OO
20
0500l5
distance/m
Fig.1Thevelocityprofilesoftruck
3InvestigationsandAnalysisofOperationSpeeds
inMountainTerrain

3.1OperationSpeeds
Theroutedesignmethodsofoperationspeedsare
re

tionspeedsareactualtravelspeedsofvehiclesina
sectionofahighway;generally85percentilespeeds
and15percentilespeedsareusedforrepresentationof
operationspeeds.
85”percentilespeedsarethespeedsof85%ac.
cumulativefrequencyinspeedsaccumulativecurves.
15percentilespeedsarethespeedsof15%accumu格律诗 .
1ativefrequencyinspeedsaccumulativeCHrves.
15percentilespeedsand85”percentilespeeds
wereusedasreferenceindexesofadmittedspeedsand
idealmaximumtravelspeedsintheanalysisofgrade
lengthlimitationoffreewayinmountainterrain.
3.2ChoiceofSamplesQuantities
Themethodsofrandomsampleswereadoptedin
thisresearchinordertoensureunprejudicedsamples.

556?
Thecapacityofsampleswasdeterminedbyresearch
precisionandminimumcapacityofsamples(n)was
decidedbyfunction(5)asfollows:
n=
(+(5)
wheretistheconstantsatisfiedcertaintybelievedlev.
el:Eisthepermittederror:iSthestandarddevia.
tion:uisthecoemcientofvehiclevelocitiessorts.
A11oftheobservationsectionsareonfreeways.
AccordingtoManualofTrafficEngineeringStudies,
thebelievedlevelwaschosenas95%.t=1.96.E=
2km/h:therangeofstandarddeviationwas6.8
8.5km/h,wastakenas8.0km/h:coefficientof
vehiclevelocore

thecapacitiesofinvestigationsampleswere200inthis
research.
3.3TheInvestigationofOperationSpeeds
ChengY.Yu
freewayandKunQufreewayinYunnanprovince.3
mountainousterrainfreewaysinsouthwestregionsof
China,eoperationspeedson7
typicalsectionsof3mountainterrainfreewayswerein.

vestigatedutilizingtheequipmentoftrafficcollection
systemsofSwedenhighwaybureau,NC97ofNU
itionsandcharac.
tersofinvestigationsectionsareshowninTab.4.
Relationshipsbetweengradesand15thpercentile
speedswereanalyzed,basedonthestatisticresultsof
15….2isthefittingCHrveof
gradesand15percentilespeeds.
Wecanseethattherelationshipsarenon.1inear.
correlatefR=
0.8562),andregressionfunctionisshownasfollows:
u=0.8164ietween
ingthis
educethe15percentilespeedscorre.
ittedvelocitiesof
roadgradesinupslopescan独出心裁的意思 bedeterminedby15”per-
ultsofadmittedvelocitiesof
roadgradesinupslopesareshowninTab.5.
Tab.5Thevaluesofadmittedveiocity
Theidietravelvelocitieswereaffectedbyvehicle
gnspeedis
100km/letravelspeedwillbe85km/h:If
designspeediS80km/ietravelspeedwillbe
80km/h:IfdesignspeediS60km/letravel
speedwillbe60km/h.
4GradelengthLimitation
Intheconditionsofthrottle90%opened,avehi
clerunonarampcanovercoinethegradeswithmaxi.
valuesofgradientiSidie
einereaseofroad
edofvehicletravelwilldecrease:when
thevehicletravelspeedsdecreasetoadmittedveloci.
dientswillbeunlimitedlengthmaximum
rtoassurevehicletravelspeedswas
gthofroadlon.
gitudinalslopewayshouldbelimitedwhenagradeis
biggerthanunlimitedlengthmaximumgrade,namely
gradelengthlimitationofsteepslope.
4.1TheCalculationofGradeLengths
Theaccelerationsanddecelerati0nswerethefunc.
ecelerationdistancesinramp
canbededucedfromthefunctions,moreovergrade
lengthlimitationcanbedetermined.
Due0(t:.d:.

a
Theequationofdistancesofslowdowninslope
wayscanbewrittenas:
v

2vdv
=
1v

:Vd

V
dV.(7)
Theplanimetryofnumericalanalysiswereusedin
Eq.(7)tosolveintegrals,utilizingthesoftwareofMat
culationresultsofdecelerationdistancesare
showninTab.6thinkingofgrades,altitude.
Tab.6Decelerationdistancesonslopeways

557?
{.vdingtothedistancesofdecelerationforve

amendmentvaluesofgradelengthlimitationwasput
adewas3%,thedis-
tancesofdecelerationon0mand1000mheightabove
hevalues


waywecandeducetheothervaluesofamendment.
ComparingTechnicalStandardofHighwayEngi-
neeringinTab.7withdecelerationdistancesonslope
waysinTab.6,wecanseethatdecelerationdistances
utilizedthemodelofadmittedvelocitiesandgradesto
calculatewasmuchbiggerthanthevaluespr另辟蹊径的意思 escribed
ans
designspecificationforhighwayroutesingradelength
regreatinflu
encesonprojectsofroute,includinglayoutofroute,
qualityofengineers,andmakingtheconstructedengi
mentexcessive
high,anddifficultiesofconstructionexcessiv《闻官军收河南河北》古诗 ehard.
Theamendmentvaluesoflengthsconfinedforhighway
longitudinalslopewayswereputforwardandareshown
inTab.7

Tab.7Longitudinalslopewayslengthconfinesofhighway
(Annotation:()modificationsuggestionsvalues)
5ConclusionsandFutureResearch
1)Theequationsofdecelerationanddeceleration
distancesonslopewayswithairrisingforcewereestab
lishbasedonvehicledynamics.
2,Arelationshipmodelbetween15percentile
speedandgradientwereestablishedbymeansofre
gressionanalysis.
3,Amethodofdeterminedadmittedvelocityin
upslopewasputforwardaccordingtothegrades.
4)Theamendmentvaluesofgradelengthslimita
tionoffreewayi11mountainterrainwereputf0rward.
Gradelengthlimitationofhighwaysinupslopeand
downslopetobeconstructedinmountainousterrainstill
deservesfurtherstudy.
References:
[1]FANZhenyu,ZHANGJianfei
theoperatingspeedcomputing

558?
Analysisandcalibrationof
modelsonhighwaysections
[J].ChinaJournalofHighwayandTransport,2002,15
(1):168172.
[2]PEIYulong,chonoperationspeed
lofInsti
tuteofTechnology,2003.35(2):168172.
3]SHIFeirong.Yimumlongitudinal
slopeanditslengthofmountainexpresswayunderthecon
ditionofvehicle’sdrivingdownlofTrafficand
TransportationEngineering,2001,1(2):6873.
[4]LIQingbo,ticalanalysisofhighwayIon
gitudinalgradedesigned[J].JournalofChangshaCommu
nicationsUniversity.1998.14(13):4046.
[5]PEIYySurveysandDesign[M].Hei
longjiang:HeilongjiangScienceandTechniquePublishing
Press,1997.
6].Vehicledynamicsmodelforpredic
lof
TransportationEngineering,2001,127(5):418425.
[7]yonrampdesigncriteriaforrampme
terswithexcessivequeuedetectorsA1.81stAnnual
MeetingoftheTransportationResearchBoard[C].Wash

ington:[s.n.],2002.



Lycan是什么意思an在线翻译读音例句-关于莫言的作文


更多推荐

speeds是什么意思eds在线翻译读音例句